YIMA - Focused on clothing labels & accessories for 20 years

hang tags with logo

YIMA focuses on clothing accessories.
Main products are:hang tag,Hang Tag String,Heat Transfer Label,Leather/Metal Patch,Embroidery Patch,Packing Box & Bag,Print Label,PVC/Silicone Patch,Woven Label,etc.

 

 

 

The core role of logo in hang tag
Visual anchor
Establish brand association quickly: consumers recognize logo at first sight and form “product-brand” association (such as seeing the check mark logo and thinking of Nike).
Strengthen VI unity: hangtag logo must strictly follow brand visual specifications (such as color, font, proportion), and be consistent with packaging, stores, advertisements, etc.
Trust endorsement
Convey brand tone: high-end brands reflect quality through exquisite logo crafts (such as hot stamping, metal engraving); trendy brands use exaggerated and deformed logos to convey personality (such as Off-White’s slash arrow).
Anti-counterfeiting function: special craft logos (such as microtext, laser anti-counterfeiting) can prevent counterfeiting (such as the three-dimensional embossed logo of luxury hangtag).
Marketing carrier
Extend brand story: mark the brand’s founding year, slogan (such as “Since 1921”) or values ​​(such as “sustainable fashion”) next to the logo to deepen the brand image.
Guide interaction: Print a QR code in the logo area, and scan it to jump to the brand’s official website, social media or membership center (such as the QR code on the tag of fast fashion brand ZARA).

yima equipment

YIMA equipment
YIMA equipment
YIMA equipment
YIMA equipment

About delivery

How to shipping?
We need to consider both the shipping time and cost to select the best mode of transport, fast and economical.
We have a complete logistics supply system, including air freight, sea freight, railway, truck, express delivery, etc.
Our main partners include: DHL (Member), FedEx (Member), UPS, K&N, etc.

Shipping time reference (Door to door):
• Express (DAP): 4 – 8 working days.
• Air (DDP or DAP): 10 – 12 working days
• Railway & Truck (DDP): 30 – 40 working days
• Fast ship(DDP): 24 – 28 working days
• Ship (DDP): 40 – 50 working days
The finial time depends on the goods weight and country/region.