Waterproof: Not affected by water and humid environment, suitable for outdoor use.
Plasticity: Strong plasticity, can adapt to various different modeling requirements, can be hard or soft, thin or thick, transparent or opaque.
Durability: Plastic hang tags are more durable than paper hang tag, not easy to break or deform, and can maintain their shape and integrity for a long time.
Aesthetics: Through different printing techniques and surface treatments, colorful design effects can be achieved.
PVC hang tag: Manufacturers commonly use PVC, a plastic material that features good impact resistance and ductility, resists deformation and fading, offers rich and varied colors, carries a low price, and allows for easy processing.
EVA hang tag: EVA is a non-toxic, odorless, transparent thermoplastic plastic with excellent elasticity, flexibility, and transparency. There are a variety of colors to choose from.
PET hang tag: PET is an environmentally friendly material with excellent transparency and wear resistance. It is suitable for making hang tag that need to display the internal structure of the product.
ABS hang tag: ABS has good mechanical properties and heat resistance, and is suitable for making hangtag that need to withstand a certain weight or pressure.
To recycle plastic hangtags, handle them in accordance with local environmental regulations to reduce environmental pollution.
The production process of plastic hang tags usually includes the following steps:
Design: Determine the size, shape, color and information to be printed on the hangtag.
Mold making: Make molds according to the design for subsequent mass production.
Injection molding: Inject molten plastic into the mold to cool and harden to form the required hangtag shape.
Printing: Use screen printing, thermal transfer, UV printing and other methods to print the necessary information on the hangtag.
Punching and assembly: Punch holes in appropriate locations and assemble accessories such as lanyards or clips so that the hangtag hangs firmly on the product.
yima equipment
About delivery
How to shipping?
We need to consider both the shipping time and cost to select the best mode of transport, fast and economical.
We have a complete logistics supply system, including air freight, sea freight, railway, truck, express delivery, etc.
Our main partners include: DHL (Member), FedEx (Member), UPS, K&N, etc.
Shipping time reference (Door to door):
• Express (DAP): 4 – 8 working days.
• Air (DDP or DAP): 10 – 12 working days
• Railway & Truck (DDP): 30 – 40 working days
• Fast ship(DDP): 24 – 28 working days
• Ship (DDP): 40 – 50 working days
The finial time depends on the goods weight and country/region.
Automated page speed optimizations for fast site performance