YIMA - Focused on clothing labels & accessories for 20 years

woven tags

YIMA focuses on clothing accessories.
Main products are:hang tag,Hang Tag String,Heat Transfer Label,Leather/Metal Patch,Embroidery Patch,Packing Box & Bag,Print Label,PVC/Silicone Patch,Woven Label,etc.

 

 

 

Woven tags are labels that are woven on a loom. The following is a detailed explanation of woven tags:

1. Production process

Raw material selection: woven tags usually use a variety of fiber materials, such as cotton, linen, silk, synthetic fibers, etc. The choice of these materials depends on the desired label texture, durability and cost.
Weaving process: On the loom, the pattern and text of the label are formed by the interweaving of warp and weft threads. This process can accurately control the size, shape and color of the label.
Cutting and finishing: After weaving, the label is cut with a special knife to ensure that its size and shape meet the requirements. Then, the label is sorted to remove excess thread ends and impurities to improve its appearance quality.

2. Features and advantages

Durability: woven tag have high strength and wear resistance due to their unique weaving structure, can withstand large tension and friction, and are not easily damaged.
Customizability: woven tag can be customized according to customer needs, including size, shape, color, pattern and text to meet the identification needs of different products.
Environmental protection: Compared with some printed labels, the materials used in the production process of woven tags are more environmentally friendly and easy to recycle and reuse, which is in line with the concept of sustainable development.

3. Application areas

Woven tags are widely used in various clothing, shoes, bags, household items and other products as carriers of brand logos, size information, washing instructions and other content. They not only have practical functions, but also can enhance the overall quality and brand image of the product.

yima equipment

YIMA equipment
YIMA equipment
YIMA equipment
YIMA equipment

About delivery

How to shipping?
We need to consider both the shipping time and cost to select the best mode of transport, fast and economical.
We have a complete logistics supply system, including air freight, sea freight, railway, truck, express delivery, etc.
Our main partners include: DHL (Member), FedEx (Member), UPS, K&N, etc.

Shipping time reference (Door to door):
• Express (DAP): 4 – 8 working days.
• Air (DDP or DAP): 10 – 12 working days
• Railway & Truck (DDP): 30 – 40 working days
• Fast ship(DDP): 24 – 28 working days
• Ship (DDP): 40 – 50 working days
The finial time depends on the goods weight and country/region.